Archive for March, 2010

Things to Remember When Installing a Heat Pump

Tuesday, March 30th, 2010

Many people are looking for ways to save up on energy costs. The heat pump has two main functions. It acts as a heater and cooling device at the same time. The heater pump will spare you financial cost of buying two separate units at the same time. When you get a heater pump that meets your requirements you should determine how you are going to start utilizing it. There are a few things that you need to put in mind before installing one. You should ensure that you get a professional to guide you on the basic principles of installing it.

When you get a qualified technician it will make the process of installation quite easy and simple. It will also be quite convenient as you are not equipped with the skill man ship to install one. In addition you will get the best tips on how to maintain and care for your pump.

Bar Stools to Bring the Indoor Look Outdoors

Sunday, March 28th, 2010

There are a number of ways you can improve your outdoors and give it an indoor feel to it. You should try to picture a different outlook to your outside. You should first evaluate the general surroundings to look what would fit where and why. In addition, you can make use of the trees around your area.

Decide on the theme that you want to go with. Decide on the spot that you want to use for the project if there aren’t tree around you should give it a thought. You should ask about their water needs, the size and also about heat tolerance for the trees. You do not have to plant tree on the ground, you can use pots too. Set up the stools and a barbeque spot. Make a walking path it the site is established on area with dirt. Using stools will give the outdoor area life.

DIY Solar Panels Construction Ideas

Friday, March 26th, 2010

If you are interested in using green energy in your home, there are some simple solar panel construction ideas that you can use. All you need is some motivation and an instruction manual to start. It will cost you less than $200 to build your solar panels which is a small price to pay for the savings that you will make on electricity bills.

Make sure your house has a rooftop that faces the sun directly and has a lot of sunlight before you even start thinking about constructing the panels. There are various solar panel kits that you can buy in the shops. The panels have to be placed in the right location and angle to ensure that they capture maximum sunlight.

The guides that are provided in the kits are very easy to understand and the installation process does not take long. You can also make it a family project to include all the members.

DIY Shed Construction

Friday, March 26th, 2010

When you decide to construct your own shed, the first thing you need is a foundation that is solid. A good one should have concrete blocks or wood timbers that are pressure treated. These materials need to be directly set into the ground. Once they are set, you have to make sure they are leveled to support the floor frame on your shed.

Wood is an essential material when constructing a shed but it is also prone to rot due to water. You have to make sure that the wood used to make the mudsill is about 6 inches away from the ground. This will provide adequate space for air circulation. The floor frame needs to be weather resistant if you want the shed to stand for long. Materials that do not need a lot of maintenance are the best choice. Make sure the door is wide enough to accommodate your machines and tools.

Precautions to be taken During Construction of Brick Pillars

Friday, March 26th, 2010

When you are constructing brick pillars, there are certain precautions you should take to ensure that they meet the required safety regulations.

One of the most important things you should consider during the construction is the weight that the brick pillars will support. They have to be strong enough to prevent the building from collapsing.

The raw materials that you are going to use for the construction should be used according to the specifications. When you are making mortar to use in the brick pillars, make sure you utilize coarse sand. The bricks have to be perfectly burnt and the corners should be faultless.

When mixing the sand and cement to make the mortar, the ration has to be 4:1. The bricks should also be properly soaked when using them. After you have constructed the brick pillars, they have to be cured for at least ten days to make sure they set well.

Different Types of Plastering for Construction Work

Friday, March 26th, 2010

There are various types of plastering used in construction and each one of them is designed to be used for a specific type of job. Dry lining is one of the oldest types of plastering and is mainly used in timber structures. This technique is easy and installation takes a very short time. With dry lining plastering, you also have flexibility therefore you can create the specific kind of atmosphere that you want in your home. It is also a cheaper option compared to other types.

Wet plaster is widely used in construction and in this case, mortar is used to cover the surface. Once a surface has been plastered using this method, it can be painted or papered. This type of plastering requires you to be very skilled to do it.

Screeding is also a type of plastering and cement, gypsum and calcium sulphates are used to make the mixture.

Difference between Basement and Additional Upper Floor

Friday, March 26th, 2010

A basement refers to a floor of a building that is partially or completely underneath the building’s ground floor. To have a basement, the foundation has to be deep. These floors are usually used to provide space for furnaces, breaker panels, water heaters, fuse boxes and air conditioning for the building. In some building, the basement is used as a car park. If the basement is in a house, it can be turned into a living space it the windows are above ground level.

An additional upper floor refers to a level of the house that is added to the existing house. The floor is usually added to provide more living space for an office or bedrooms.
The main difference between these two is that the basement is usually constructed when the rest of the house is being built while the additional upper floor is added on the original structure.

How to Prevent Cracks in Buildings

Friday, March 26th, 2010

There are various steps you can take to prevent the formation of cracks in a building. This has to start during the construction phase because this is where mistakes occur.

You have to know the right kind of materials to use for constructing a building. If the right materials are used following the specifications provided, this will reduce the occurrence of cracks.

The specifications you use when you are making the concrete and mortar should also be right. The mixture you create has to be well mixed, homogenous and should not have excess water.

Make sure the building’s foundation is not on muddy or loose ground. Reinforcements should be used to create a solid foundation.

To prevent cracks in a building, the construction process should be very uniform. Use the best practices to construct the building. Construction should not be carried out when there is extreme hot, dry or cold weather to prevent cracks.

Iron Sheet Roofing

Friday, March 26th, 2010

Iron sheet roofing has gained popularity over the years because it has several advantages. One of the main advantages is that this type of roofing is very durable and can last for several years. Iron sheet roofing can withstand heavy winds, rain, and snow. It is also resistant to insects and mildew.

Iron sheet roofing is light in weight and this makes it very easy to handle when you are installing it. The installation process is also very easy and it will take a very short time to put up the roof compared to concrete tiles.

Iron sheet roofing is resistant to fire and as long as the material that is below it is not combustible, your roof will be safe from fire.

This type of roofing will also reflect the sun’s heat and this means that your house will not overheat during the day. It is cheaper option if you are looking for affordable roofing.

Guidelines for Sewerage Pipe Works

Friday, March 26th, 2010

To ensure that hygienic conditions are maintained in a building, sewerage pipe works guidelines have to be followed carefully. The connections in the central and branch pipes have to be well arranged to ensure that there is no cross flow. The building, soil and waste sewer pipes also have to be wide enough to allow adequate flow.

The minimum gradient has to be one in 57 for a pipe that measures 100mm in diameter. For a pipe that has a 150mm diameter, the minimum gradient should be one in 100.

Make sure the appliances and pipe works are arranged to make it easy to group the connections with your water closet close to the central soil pipe. Keep your branch pipes short to prevent them from producing a lot of noise.

The sewer pipes have to be fixed when you are doing the brick work. This will prevent the need to dismantle the brick work to fix them.